The Transmission Company of Nigeria (TCN) has successfully taken final delivery of 15 units of Emergency Restoration Towers (ERT) and bulk equipment spares in Port Harcourt Region, transported from the Ojo Corporate Headquarters Store in Lagos on Friday, November 20, 2026.
The consignment includes Emergency Restoration Towers, a 40-foot container housing accessories, 14-foot and 7-foot tower sections, box sections, foundations, 9116DIAX19 ERS, guywire/STL guy, tire jacks, bi-metallic foil sheets, flat end clamps, 150mm² jumper pads, 150mm² come-alongs, transformer oil, a gas sniffer, gimbal joints, and straight clamps.
These specialized towers are designed for the rapid, temporary restoration of power lines in the event of vandalism or tower collapse along transmission corridors within the region. The acquisition of these critical spares underscores TCN’s commitment to minimizing equipment downtime and ensuring prompt response to network faults across the region.

